May 4, 2010, Bond Request Project List
Arcadia Elementary
- Replace asphalt paving
- Install concrete pads around paved catch basins
- Install barrier-free ramp and handrails at main entry
- Install barrier-free access at exterior stoops
- Replace masonry screen wall at entry
- Replace corridor coat hooks with lockers and replace existing lockers
- Replace boiler
- Replace Media Center air handling unit and add cooling
- Replace Office area air handling unit and add cooling
- Replace Cafeteria air handling unit and add cooling
- Replace 2 HW circulation pumps including valves and piping
- Replace pneumatic controls air dryer
- Replace classroom unit ventilators and add cooling
- Replace/add site lighting
Edison Environmental Science Academy
1929 Building
- Install barrier-free access at south entry stoop
- Install barrier-free access at Gymnasium exits
- Add barrier-free access to stage
- Replace public address system
1958 Building
- Install barrier-free access at exterior stoops
- Install elevator for access to second floor
- Replace all windows and retrofit panels
- Replace exterior doors
- Add second floor corridor lockers
- Provide rated separation for egress stairs
- Replace site lighting
- Replace public address system
El Sol Elementary
1924 Building
- Remodel third floor for occupancy
- Replace public address system
- Replace master clock system - including main panel
1963 Building
- Oak Street sidewalks need barrier-free curb cuts
- Provide accessible ramp to main entry
- Replace roofing and insulation
- Replace exterior downspouts with new internal system
- Replace public address system
- Replace master clock
Greenwood Elementary
- Separate bus and visitor parking areas
- Install concrete pads around paved catch basins
- Remove/replace asphalt paving
- Replace roof
- Remodel toilet rooms
- Replace floor tile in gymnasium
- Replace/add site lighting
- Replace public address system
Indian Prairie Elementary
- Connect bus loop sidewalk to Grand Prairie and add marked crosswalk
- Install barrier-free access at exterior stoops
- Replace Cafeteria and stage lighting
- Replace gymnasium lighting
- Replace remaining site lighting
- Replace public address system
- King-Westwood Elementary School
- Replace north parking lot and drives
- Install barrier-free access at exterior stoops
- Replace Office air handling equipment
- Replace drinking fountains
- Widen sidewalk in front of school
Lincoln International Studies School
- Install concrete at catch basins in asphalt paving
- Remove replace heavy duty asphalt paving
- Install ramps at exterior exit doors for accessibility
- Replace classroom ceilings
- Replace fire escape on north end
- Relocate gas shutoff to outside of Boiler room
- Replace pneumatic controls air dryer
- Replace storm drain backwater valve
- Replace DHW circulating pump
- Replace classroom lighting
- Replace exterior building lighting
- Add site lighting
- Install occupancy lighting sensors throughout
- Replace public address system
Milwood Elementary School
1921 Building
- Install barrier-free access at exterior stoops
- Replace lintels, re-tuck-point, and repair masonry
- Replace fire alarm system
1949 Building
- Replace entrance canopies
- Install barrier-free access at exterior stoops
- Replace entire fire alarm system
- Replace site lighting fixtures
Northeastern Elementary School
- Replace asphalt parking lots and circle drive
- Install concrete pads around paved catch basins
- Install barrier-free access at exterior stoops
- Replace Gymnasium/Locker Room roofs
- Replace fire alarm system
- Replace/add site lighting
Northglade Montessori Magnet School
- Install barrier free access at exterior stoops
- Install playground equipment
- Replace corridor lights in 1959 section
Parkwood-Upjohn Elementary School
- Install barrier-free access at exterior stoops
- Widen sidewalk in front of school
- Repair foundation cracks
- Replace lintels and re-tuck-point and repair masonry as needed
- Replace windows
- Replace exterior doors and frames
Spring Valley Center for Exploration
- Replace pneumatic controls compressor & air dryer
- Replace lighting in 1956 and 1958 Sections
- Install occupancy lighting sensors
- Install generator and emergency lighting
Washington Writers' Academy
- Construct new elementary school
Winchell Elementary School
- Remove and replace asphalt pavement
- Replace hard surface play areas
- Install barrier-free access at exterior stoops
- Install barrier-free access to stage
- Replace pneumatic controls air compressor and air dryer
- Replace/add site lighting
- Replace the public address system
Woods Lake Elementary: A Magnet Center for the Arts
- East side ramp development
- Add handrails at stairs and ramp from lower parking lot
- Install stair access to play fields
- Install walkway path and landscaping to Main Office entry
- Install barrier-free curb cuts to exterior curbs
- Install barrier-free access at exterior stoops
- Replace ceilings
- Install acoustical ceiling in Music Room
- Replace Kitchen ceiling
- Replace Kitchen lighting
- Replace boiler and piping
- Replace boiler feed unit
- Replace pneumatic controls air compressor & air dryer
- Replace two valves at water meter
- Replace lighting in Music Room
- Replace T-12 lighting with T-8
- Replace/add site lighting
- Replace the public address system
Woodward School for Technology and Research
- Install concrete pads around paved catch basins
- New 48-inch drywell
- Concrete curb and gutter
- Replace asphalt in courtyard and by building
- Remove and replace asphalt paving
- Remove and replace asphalt for track
- Provide barrier-free access to Annex entries
- Install barrier-free access to stage
- Replace roof on single story addition
- Replace cracked sections of foundation wall
- Portions of exterior masonry and control joints should be replaced
- Replace all windows
- Replace original exterior doors, frame, and hardware
- Replace air dryers
- Replace/add site lighting
Hillside Middle School
- Replace asphalt paving
- Install barrier-free access at exterior stoops
- Install barrier-free access to stage
- Replace flooring
- Replace fire alarm system
- Replace Gymnasium air handling units
- Replace air dryer
- Replace public address system
- Construct addition to school
Maple Street Magnet School for the Arts
- Remove and replace concrete steps with railings
- Replace remaining asphalt paving
- Install concrete pads around paved catch basins
- Install fencing at boiler House roof
- Replace stoops for barrier-free access
- Replace poorly sealed penetrations on exterior of building
- Install barrier-free access to stage
- Remodel locker rooms, lobby and Gymnasium
- Replace Kitchen air handling unit
- Replace Cafeteria air handling unit
- Replace air dryer
- Install cross contamination protection on water supply
- Replace and add site lighting
- Replace public address system and associated wiring and speakers
Milwood Magnet School Center for Math, Science and Technology
- Separate student drop off and parent parking
- Replace asphalt parking
- Install barrier-free access at exterior stoops
- Install barrier-free access to stage
- Refinish Gymnasium floor
- Replace fire alarm system
- Replace air dryer
- Replace drinking fountains
- Replace public address system
- Construct addition to school
Kalamazoo Central High School
- Remove/replace standard duty asphalt
- Install concrete at parking lot catch basins
- Install concrete steps with rail at Locker Rooms
- Install barrier-free access and parking to athletic fields
- Add barrier-free curb cuts to sidewalks
- Install barrier-free access at exterior stoops
- Provide barrier-free access to pool bleacher area
- Make varsity locker rooms accessible
- Replace overhead doors at Drivers' Training classroom
- Remodel science rooms
- Remodel Room 535 into Drafting Lab
- Purchase equipment and equipment for Room 553 computer lab
- Refinish Gymnasium floor
- Provide pool cover
- Replace pool air handling equipment with heat recovery
- Replace air dryer
- Install pool dehumidification system with heat recovery
- Replace corroded water piping from boiler room to equipment room
- Replace all remaining T-12 light fixtures with T-8
- Replace Boiler Room lights
- Improve under soffit lighting around 3-story building with controls
- Install lighting along football field and baseball fields
- Replace site lighting and poles around shop wing
- Improve Gymnasium Main Entrance lighting, exterior
- Install occupancy lighting sensors in all classrooms and restrooms
- Install generator and emergency lighting
Loy Norrix High School
- Replace exterior concrete stairs and railings
- Remove and replace concrete walks
- Remove and replace Receiving Area asphalt
- Replace football stadium bleachers
- Install accessible route (concrete walk) to athletic facilities
- Install barrier-free access at exterior stoops
- Provide elevator to stair tower for barrier-free access
- Replace pool, J-unit, Auditorium and stair tower roof
- Replace pool timing system
- Add steam exchanger and piping controls to pool heating system
- Replace visual displays (markerboards and tackboards)
- Replace fire alarm system
- Replace cooling tower pump
- Replace all fin tube in commons area A, B, C pod ramps
- Replace air handing units in Auxiliary Gymnasium
- Replace air handling units in A, Choir, 2 Pool area air handling units and Band Rooms
- Replace pneumatic controls with DDC
- Install pool dehumidification system with heat recovery
- Add pool cover
- Repair/replace downspouts
- Replace primary switch & transformers East of Auditorium Drive
- Replace exterior lighting around building North of Auditorium Drive
- Upgrade emergency lighting in Auditorium
- Install occupancy lighting sensors in all classrooms and restrooms
- Install transfer switch for Office, Technology Closet and Security System
Phoenix High School
- Remodel Room 1 into Science Lab
- Replace asphalt parking lot
- Replace concrete at Loading Dock where it has crumbled
- Replace air dryer
- Replace drinking fountains
- Replace/add site lighting
- Replace master clock and secondary clocks
Administration Building
- Install handrails at sidewalk steps
- Replace west entry guardrail
- Relocate barrier-free toilet for second means of egress from South Office area
- Replace handrail and guardrail at north stair
- Replace steam boiler with hot water and heating distribution piping
- Replace penthouse air handling units and cooling tower
Community Education Center
- Replace heavy duty concrete
- Install barrier-free access at exterior stoops
- Roof replacement in areas A and C
- Remodel KAMSC
- Replace pneumatic controls air dryer
- Connect technology closets and security system to generator
Lake Street Barns
- Re-grade site and install asphalt pavement and improved site drainage
- Replace/add exterior site lighting
Oakwood Elementary School
- Replace boiler and piping
West Main School Professional Development Center
- Replace roof
- Install generator and emergency lighting
District-wide Items
Facilities Management
Business Office
- Bus replacement
- Technology equipment
- Library books
- Food Service equipment
- Equipment replacement
- Furniture replacement
- Art / Music equipment replacement
- Bond issuance costs, less interest earnings