May 4, 2010, Bond Request Project List

Arcadia Elementary

  • Replace asphalt paving
  • Install concrete pads around paved catch basins
  • Install barrier-free ramp and handrails at main entry
  • Install barrier-free access at exterior stoops
  • Replace masonry screen wall at entry
  • Replace corridor coat hooks with lockers and replace existing lockers
  • Replace boiler
  • Replace Media Center air handling unit and add cooling
  • Replace Office area air handling unit and add cooling
  • Replace Cafeteria air handling unit and add cooling
  • Replace 2 HW circulation pumps including valves and piping
  • Replace pneumatic controls air dryer
  • Replace classroom unit ventilators and add cooling
  • Replace/add site lighting

Edison Environmental Science Academy

1929 Building

  • Install barrier-free access at south entry stoop
  • Install barrier-free access at Gymnasium exits
  • Add barrier-free access to stage
  • Replace public address system

1958 Building

  • Install barrier-free access at exterior stoops
  • Install elevator for access to second floor
  • Replace all windows and retrofit panels
  • Replace exterior doors
  • Add second floor corridor lockers
  • Provide rated separation for egress stairs
  • Replace site lighting
  • Replace public address system

El Sol Elementary

1924 Building

  • Remodel third floor for occupancy
  • Replace public address system
  • Replace master clock system - including main panel

1963 Building

  • Oak Street sidewalks need barrier-free curb cuts
  • Provide accessible ramp to main entry
  • Replace roofing and insulation
  • Replace exterior downspouts with new internal system
  • Replace public address system
  • Replace master clock

Greenwood Elementary

  • Separate bus and visitor parking areas
  • Install concrete pads around paved catch basins
  • Remove/replace asphalt paving
  • Replace roof
  • Remodel toilet rooms
  • Replace floor tile in gymnasium
  • Replace/add site lighting
  • Replace public address system

Indian Prairie Elementary

  • Connect bus loop sidewalk to Grand Prairie and add marked crosswalk
  • Install barrier-free access at exterior stoops
  • Replace Cafeteria and stage lighting
  • Replace gymnasium lighting
  • Replace remaining site lighting
  • Replace public address system
  • King-Westwood Elementary School
  • Replace north parking lot and drives
  • Install barrier-free access at exterior stoops
  • Replace Office air handling equipment
  • Replace drinking fountains
  • Widen sidewalk in front of school

Lincoln International Studies School

  • Install concrete at catch basins in asphalt paving
  • Remove replace heavy duty asphalt paving
  • Install ramps at exterior exit doors for accessibility
  • Replace classroom ceilings
  • Replace fire escape on north end
  • Relocate gas shutoff to outside of Boiler room
  • Replace pneumatic controls air dryer
  • Replace storm drain backwater valve
  • Replace DHW circulating pump
  • Replace classroom lighting
  • Replace exterior building lighting
  • Add site lighting
  • Install occupancy lighting sensors throughout
  • Replace public address system

Milwood Elementary School

1921 Building

  • Install barrier-free access at exterior stoops
  • Replace lintels, re-tuck-point, and repair masonry
  • Replace fire alarm system

1949 Building

  • Replace entrance canopies
  • Install barrier-free access at exterior stoops
  • Replace entire fire alarm system
  • Replace site lighting fixtures

Northeastern Elementary School

  • Replace asphalt parking lots and circle drive
  • Install concrete pads around paved catch basins
  • Install barrier-free access at exterior stoops
  • Replace Gymnasium/Locker Room roofs
  • Replace fire alarm system
  • Replace/add site lighting

Northglade Montessori Magnet School

  • Install barrier free access at exterior stoops
  • Install playground equipment
  • Replace corridor lights in 1959 section

Parkwood-Upjohn Elementary School

  • Install barrier-free access at exterior stoops
  • Widen sidewalk in front of school
  • Repair foundation cracks
  • Replace lintels and re-tuck-point and repair masonry as needed
  • Replace windows
  • Replace exterior doors and frames

Spring Valley Center for Exploration

  • Replace pneumatic controls compressor & air dryer
  • Replace lighting in 1956 and 1958 Sections
  • Install occupancy lighting sensors
  • Install generator and emergency lighting

Washington Writers' Academy

  • Construct new elementary school

Winchell Elementary School

  • Remove and replace asphalt pavement
  • Replace hard surface play areas
  • Install barrier-free access at exterior stoops
  • Install barrier-free access to stage
  • Replace pneumatic controls air compressor and air dryer
  • Replace/add site lighting
  • Replace the public address system

Woods Lake Elementary: A Magnet Center for the Arts

  • East side ramp development
  • Add handrails at stairs and ramp from lower parking lot
  • Install stair access to play fields
  • Install walkway path and landscaping to Main Office entry
  • Install barrier-free curb cuts to exterior curbs
  • Install barrier-free access at exterior stoops
  • Replace ceilings
  • Install acoustical ceiling in Music Room
  • Replace Kitchen ceiling
  • Replace Kitchen lighting
  • Replace boiler and piping
  • Replace boiler feed unit
  • Replace pneumatic controls air compressor & air dryer
  • Replace two valves at water meter
  • Replace lighting in Music Room
  • Replace T-12 lighting with T-8
  • Replace/add site lighting
  • Replace the public address system

Woodward School for Technology and Research

  • Install concrete pads around paved catch basins
  • New 48-inch drywell
  • Concrete curb and gutter
  • Replace asphalt in courtyard and by building
  • Remove and replace asphalt paving
  • Remove and replace asphalt for track
  • Provide barrier-free access to Annex entries
  • Install barrier-free access to stage
  • Replace roof on single story addition
  • Replace cracked sections of foundation wall
  • Portions of exterior masonry and control joints should be replaced
  • Replace all windows
  • Replace original exterior doors, frame, and hardware
  • Replace air dryers
  • Replace/add site lighting

Hillside Middle School

  • Replace asphalt paving
  • Install barrier-free access at exterior stoops
  • Install barrier-free access to stage
  • Replace flooring
  • Replace fire alarm system
  • Replace Gymnasium air handling units
  • Replace air dryer
  • Replace public address system
  • Construct addition to school

Maple Street Magnet School for the Arts

  • Remove and replace concrete steps with railings
  • Replace remaining asphalt paving
  • Install concrete pads around paved catch basins
  • Install fencing at boiler House roof
  • Replace stoops for barrier-free access
  • Replace poorly sealed penetrations on exterior of building
  • Install barrier-free access to stage
  • Remodel locker rooms, lobby and Gymnasium
  • Replace Kitchen air handling unit
  • Replace Cafeteria air handling unit
  • Replace air dryer
  • Install cross contamination protection on water supply
  • Replace and add site lighting
  • Replace public address system and associated wiring and speakers

Milwood Magnet School Center for Math, Science and Technology

  • Separate student drop off and parent parking
  • Replace asphalt parking
  • Install barrier-free access at exterior stoops
  • Install barrier-free access to stage
  • Refinish Gymnasium floor
  • Replace fire alarm system
  • Replace air dryer
  • Replace drinking fountains
  • Replace public address system
  • Construct addition to school

Kalamazoo Central High School

  • Remove/replace standard duty asphalt
  • Install concrete at parking lot catch basins
  • Install concrete steps with rail at Locker Rooms
  • Install barrier-free access and parking to athletic fields
  • Add barrier-free curb cuts to sidewalks
  • Install barrier-free access at exterior stoops
  • Provide barrier-free access to pool bleacher area
  • Make varsity locker rooms accessible
  • Replace overhead doors at Drivers' Training classroom
  • Remodel science rooms
  • Remodel Room 535 into Drafting Lab
  • Purchase equipment and equipment for Room 553 computer lab
  • Refinish Gymnasium floor
  • Provide pool cover
  • Replace pool air handling equipment with heat recovery
  • Replace air dryer
  • Install pool dehumidification system with heat recovery
  • Replace corroded water piping from boiler room to equipment room
  • Replace all remaining T-12 light fixtures with T-8
  • Replace Boiler Room lights
  • Improve under soffit lighting around 3-story building with controls
  • Install lighting along football field and baseball fields
  • Replace site lighting and poles around shop wing
  • Improve Gymnasium Main Entrance lighting, exterior
  • Install occupancy lighting sensors in all classrooms and restrooms
  • Install generator and emergency lighting

Loy Norrix High School

  • Replace exterior concrete stairs and railings
  • Remove and replace concrete walks
  • Remove and replace Receiving Area asphalt
  • Replace football stadium bleachers
  • Install accessible route (concrete walk) to athletic facilities
  • Install barrier-free access at exterior stoops
  • Provide elevator to stair tower for barrier-free access
  • Replace pool, J-unit, Auditorium and stair tower roof
  • Replace pool timing system
  • Add steam exchanger and piping controls to pool heating system
  • Replace visual displays (markerboards and tackboards)
  • Replace fire alarm system
  • Replace cooling tower pump
  • Replace all fin tube in commons area A, B, C pod ramps
  • Replace air handing units in Auxiliary Gymnasium
  • Replace air handling units in A, Choir, 2 Pool area air handling units and Band Rooms
  • Replace pneumatic controls with DDC
  • Install pool dehumidification system with heat recovery
  • Add pool cover
  • Repair/replace downspouts
  • Replace primary switch & transformers East of Auditorium Drive
  • Replace exterior lighting around building North of Auditorium Drive
  • Upgrade emergency lighting in Auditorium
  • Install occupancy lighting sensors in all classrooms and restrooms
  • Install transfer switch for Office, Technology Closet and Security System

Phoenix High School

  • Remodel Room 1 into Science Lab
  • Replace asphalt parking lot
  • Replace concrete at Loading Dock where it has crumbled
  • Replace air dryer
  • Replace drinking fountains
  • Replace/add site lighting
  • Replace master clock and secondary clocks

Administration Building

  • Install handrails at sidewalk steps
  • Replace west entry guardrail
  • Relocate barrier-free toilet for second means of egress from South Office area
  • Replace handrail and guardrail at north stair
  • Replace steam boiler with hot water and heating distribution piping
  • Replace penthouse air handling units and cooling tower

Community Education Center

  • Replace heavy duty concrete
  • Install barrier-free access at exterior stoops
  • Roof replacement in areas A and C
  • Remodel KAMSC
  • Replace pneumatic controls air dryer
  • Connect technology closets and security system to generator

Lake Street Barns

  • Re-grade site and install asphalt pavement and improved site drainage
  • Replace/add exterior site lighting

Oakwood Elementary School

  • Replace boiler and piping

West Main School Professional Development Center

  • Replace roof
  • Install generator and emergency lighting

District-wide Items

Facilities Management

  • Playground equipment

Business Office

  • Bus replacement
  • Technology equipment
  • Library books
  • Food Service equipment
  • Equipment replacement
  • Furniture replacement
  • Art / Music equipment replacement
  • Bond issuance costs, less interest earnings